色精阁久艾草国产-亚洲三区在线观看无套内射-97精品国产自产在线观看永久-亚洲精品国产第一综合99久久-庆余年免费在线观看

products 產(chǎn)品列表

 YP Series (Pressure Type) Hydraulic Dynamometer
 Hits:32820 AddTime:2024/2/4 9:27:21

一、Summary

YP series (pressure type) hydraulic dynamometers have been widely used abroad in the 1960s and 1970s. In 1985, through license trade, China introduced the technology of Zoller Company, West Germany, to develop and produce this type of advanced dynamometer. At present, the process technology has been used in the production of a whole series of products in China. Internationally, there are Fraud in England and Cairn Company in the United States. In addition, two domestic companies have produced this series of products in small batches through imitation. Our company digests and absorbs foreign technology, carries out new optimization design and production, and can provide a full range of products.

YP series hydraulic dynamometer has 12 specifications, all of which are controlled by electric drainage butterfly valve. That is, by changing the opening of butterfly valve to change the size of absorption power. The braking power range is from 20KW to 5900KW, and the variety is complete. Domestic and foreign users choose the right type according to their engine power range.
This product is mainly used to test the effective power of various diesel engines, gasoline engines, motors and other power engines. It is an indispensable test equipment in the performance test of power engine and the efficiency test of transmission machinery.
The basic model of this product is one-way test. If users need to order with two-way test at the same time, please make a request and our company will give special customization.

二、Technical specifications

1.Main features
◆Small size, easy installation;
◆Simple structure, easy operation and maintenance;
◆High braking moment;
◆High accuracy of measurement;
◆Work stably and reliably;
◆Achieving High Precision Instantaneous Speed Measurement with Magnetoelectric Velocity Sensor;
◆Fast Load Control of Electronically Controlled Butterfly Valve;
◆Fast response, suitable for dynamic test

2.Measuring performance indicators

Project sensor type Measuring range Accuracy Remarks
Rotating speed ZSB magnetoelectric speed sensor 300-7500r/min ±1r/min
Greater than 7500r/min
When the speed wheel and control components are treated separately.
Torque Strain gauge tension sensor Match the dynamometer range ±0.2% FS
Water valve position
Precision potentiometer
(DPF, YZ60 Watergate Actuator)
0-100% 0.2% FS
Throttle position
Precision potentiometer
(YZ60, YZ60A throttle actuator)
0-100% 0.2% FS

3.Technical parameter


Hydraulic dynamometer model
YP60 YP120 YP250 YP380 YP520 YP660 YP880 YP1200 YP1900 YP2500 YP3300
Maximum absorption rate (KW) 60 120 250 380 520 660 880 1200 1900 2500 3300
Torque measurement accuracy (FS) ±0.2% ±0.2% ±0.2% ±0.2% ±0.2% ±0.2% ±0.2% ±0.2% ±0.2% ±0.2% ±0.2%
Speed ​​measurement accuracy (FS) ±0.5‰ ±0.5‰ ±0.5‰ ±0.5‰ ±0.5‰ ±0.5‰ ±0.5‰ ±0.5‰ ±0.5‰ ±0.5‰ ±0.5‰
Spindle rotation direction unidirectional unidirectional unidirectional unidirectional unidirectional unidirectional unidirectional unidirectional unidirectional unidirectional unidirectional
Brake force measurement range (N) 0~180 0~550 0~1000 0~1300 0~2500 0~3300 0~6000 0~12000 0~18000 0~27000 0~35000
Maximum braking torque (Nm) 172 525 980 1240 2450 3150 5700 11760 17200 26460 33400
Maximum water consumption (Kg/h) 1200 2400 5000 8000 10400 13900 18500 24000 36300 50000 66000
Drainage maximum temperature (°C) 70 70 70 70 70 70 70 70 70 70 70
Total length of the spindle 448 510 500 500 600 600 802

1296

1296 1440 1440
Spindle cone length and taper 63, 1:30 70, 1:30 70, 1:30 70, 1:30 70, 1:30 80, 1:30 100, 1:30 192, 1:30 192, 1:30 170, 1:30 170, 1:30
The center of the spindle is high to the bottom of the base 255

300

300 300 350 350 650 760 760 840 840
Dynamometer dimensions (length × width × height) 450×400×370 655×530×430 640×536×460 640×536×460 760×620×543 760×620×543 1078×845×905 1598×.51310×1135 1598×.51310×1135 1452×1558×1310 145×21558×1330
Base size (length × width × height) 640×400×90 640×394×110 640×400×100 640×400×100 760×490×120 760×490×120 1060×820×310 1476×1200×260 1476×1200×260 1256×1559×260 1256×1559×260
Foot screw hole position 590×340 600×335 580×330 580×330 700×420 700×420 990×650 1350×1074 1350×1074 1421×1116 1420×1116 
(×690)
Dynamometer net weight (Kg) 170 180 200 200 410 435 950 2800 2900 3200 3300
Maximum spindle speed (r/min) 9000 7500 7500 5000 5000 3500 3000 3000 3000 3000 3000
Moment of inertia 
(Kg.M2)
0.012 0.041 0.065 0.074 0.480 0.511 0.721 3.6 4 6.8 7.1

Table units:mm

4. characteristic curve

The application scope of hydraulic dynamometer can b e seen from its characteristic curve as shown in Fig. 1 (a), (b), (c), (d), (e), (f), (g), (h). Characteristic curve shows the power range that dynamometer can absorb at different rotational speeds.
The OA curve represents the maximum power line that the dynamometer can absorb with the change of rotational speed under a certain inlet pressure.
When AB line keeps the dynamometer's maximum torque, the maximum power line that dynamometer can absorb will change with the speed.
When the AC line (YP20) and BC line are not more than the maximum permissible discharge temperature of dynamometer, the maximum power limit line that dynamometer can absorb.
CD line is the maximum speed limit line of dynamometer.
OD curve is the braking power line (air friction resistance) of Dynamometer when it is not filled with water.
The area surrounded by the curve graph OABCDO indicates the power range that the hydraulic dynamometer can absorb. This is also the basis for choosing dynamometer in power machine performance test. In general, all the characteristics of the power machine can be tested on this type of hydraulic dynamometer within the range of curve and figure.
﹡When choosing dynamometer, users must pay attention to whether the test point of the dynamometer is within the range of the characteristic curve of the dynamometer and avoid the edge of the curve as far as possible.
﹡The minimum absorptive power line (full open position of butterfly valve) is slightly higher than OD line under the optimal control of water filling, and should not be too close to OD line when selecting type.

三、Structure of dynamometer

YP type hydraulic dynamometer is mainly composed of body parts, force measuring mechanism parts, intake and drainage parts, correction parts, electric drainage valve parts, automatic regulating device parts and lubricating parts. See Figures II (a), (b).
1.Body parts
The body parts are the main parts of dynamometer to absorb the effective torque of power machine by using water. See Figures III (a), (b).
The mechanical energy output from the power machine is converted into heat energy here, which is absorbed by the water entering the shell and discharged. A very small part of the mechanical energy is dissipated to the air by the wall of the dynamometer shell.
The simple structure consists of a swinging housing mounted on a rolling bearing and a rotor mounted on a spindle. The dynamometer rotor is installed in the middle of the main shaft, and the left and right side shell and the left and right bearing shell are symmetrically installed on both sides of the rotor. The working cavity is formed by the rotor pit and the left and right side shell pit. The bimetallic bushing connected with the shell of the left and right bearing not only acts as the bushing, but also acts as the sealing water. YP880, Y1200, YP1900, YP2500, YP3300 and YP5900 dynamometers are sealed by clearance to prevent water from entering the bearing, thus ensuring the service life of the bearing.
There are drainage holes on the shell and water intake holes on the left and right bearing shell to ensure the entry of low-temperature water and the discharge of high-temperature water. There is an overflow pipe in both the left and right bearing housing, and the water thrown out by the water throwing ring is discharged after the overflow pipe enters the base.
The spindle is equipped with coupling at both ends of the cone, and the speed measuring gear is installed on one side. Through the speed measuring sensor, the spindle speed can be displayed in the digital display table.


Figure two(bY880-SY1900-S、Y3300-SOutline schematic diagram of hydraulic dynamometer

1、Body parts2、Dynamometer unit 3、Lubrication parts 4、Intake and drainage components5、correcting member6、Automatic adjusting device components

Figure three(a)YP1900Structural sketch of airframe components

1、base  2、Left and Right Bearing Seats  3、Spindle components  4、Coupling  5、Bearing plate  6. Skeleton oil seal 7, axle sleeve 8.9, bimetal axle sleeve & nbsp; 10, left and right bearing shell & nbsp; 11, left and right side shell & nbsp; 12, screw & nbsp; 13, rotor 14, shell & nbsp; 15, water seal ring & nbsp; 16, speed measuring gear & nbsp; 17, speed sensor & nbsp; 18, overflow pipe & nbsp; 19, cock

Figure three(b)YP1900Structural sketch of airframe components

1、base 2. Bearing seat 3, coupling 4, spindle component 5, bearing shell 6, shell 7, side shell 8, rotor 9, speed sensor 10, speed measuring gear


2.Force measuring mechanism components
The components of force measuring mechanism are used to measure braking force, as shown in Fig. 4 (a), (b).

It is mainly composed of brake arm, tension pressure sensor and movable bolt. The braking moment produced by the body parts is balanced with the reaction moment of the brake arm pull-up pressure sensor, and the braking force is displayed by an electronic digital display instrument. In order to protect the sensor, nylon ring or rubber ring is installed at one end of the movable plate bolt to play a buffer role. At the same time, in order to prevent the sensor from being damaged by vibration in transportation, a supporting and fixing protection device is provided. The bolt of the fixed sensor must be loosened in use, and the movable plate should be pulled to one side. If there is no movable plate, the bolt can be screwed off.


Figure four(a)YP20、YP60、YP120、YP250、YP380、YP520、YP660

Drawing of Force Measuring Mechanism Components

1. Brake arm 2, tension and pressure sensor 3, movable bolt 4, support 5, protective cover 6, movable plate 7, bolt 4


Figure four(b)YP1900Schematic diagram of dynamometer mechanism

1. Brake arm 2, fixed bolt 3, movable bolt 4, tension pressure sensor


3、Intake and drainage components
The intake and drainage components are composed of intake components and drainage components. It is mainly used for entering low temperature water and discharging high temperature water when dynamometer works. See Fig. 5 (a), (b).
YP60, YP120, YP250, YP380, YP520 and YP660 hydraulic dynamometers are composed of brackets, pipes and elbows. The elbows are connected with the left and right bearing housing of the body parts to form the intake pipeline of the dynamometer.
The drainage components are composed of brackets, pipes and elbows. The elbow is connected with the outer shell to form a drainage pipeline of dynamometer. The water thrown out by the water throwing ring in the body parts is discharged after the overflow pipe enters the base.

The intake parts of YP880, YP1200, YP1900, YP2500, YP3300 and YP5900 dynamometers are composed of intake valve parts and intake pipes. The drainage components are composed of a drainage butterfly valve, a drainage elbow and a drainage actuator.


Figure five(a)Drawing of Intake and Drainage Components

1. Overflow pipe 2, permeable pipe 3, intake parts (5, elbow 6, pipeline 7, bracket) 4, drainage parts (8, bracket 9, pipeline 10, elbow)

Figure five(b)Y880-S、Y1900-S、Y3300-SDrawing of Intake and Drainage Components

1. Spillway 2, Intake Component 3, Drainage Actuator 4, Drainage Butterfly Valve 5, Drainage Bend

4、  Calibration Component (Static Calibration Component)
Calibration components are used for static calibration of dynamometers, as shown in Fig. 6.
It is mainly composed of calibration arm, lifting parts, suspenders, trays and weights.
The distance L from the center of dynamometer spindle to the triangular knife edge of static calibration arm and the total weight W are shown in the table below.
L and W values


Model Arm lengthL(mm)±0.125 Weight total weightW(kg)
YP60 973.8 18
YP120 973.8 55
YP250 468.9 200
YP380 486.9 260
YP520 973.8 250
YP660 973.8 330
YP880 973.8 600
YP1200 1947.5±0.30 600
YP1900 1947.5±0.30 900
YP2500 1947.5±0.30 1350
YP3300 1947.5±0.30 1750

Fig. 6. Schematic diagram of correction components
1. Correction arm 2, lifting parts 3, lifting rod 4, tray 5, weights

5. & nbsp; Electric Drainage Valve Components
DPF electric drain valve components are used to automatically control the opening position of the drain valve, adjust the pressure of the dynamometer chamber, so that the thickness of the water ring changes with the change of working conditions, that is, to change the absorption load, as shown in figure 7.
It is mainly composed of shell, moment motor, planetary gear pair, butterfly valve, potentiometer and so on. Matching with the electronic control cabinet, the opening of the valve can be controlled by the compartment.

YP60、YP120、YP250、YP380、YP520、YP660 Hydraulic dynamometers use this form to control the drainage butterfly valve



Figure sevenDiagram of DPF Electric Drainage Valve Components

1. Potentiometer 2, Torque Motor 3, Planetary Pair 4, Shell 5, Butterfly Valve

6、   Automatic adjusting device components
The components of the automatic regulating device control the opening position of the valve slice of the drainage butterfly valve through the drainage actuator, and adjust the pressure of the inner chamber of the dynamometer to change the load, as shown in figure 8.

Fig. 8. Component sketch of automatic regulating device
1. Drainage Actuator 2.3, Gear Pair (Synchronized Tooth Belt) 4, Angle Iron 5, Drainage Butterfly Valve 6, Support Plate

It is mainly composed of drainage actuator, drainage butterfly valve, supporting plate, gear pair, etc.

YP880, YP1200, YP1900, YP2500, YP3300, YP5900 hydraulic dynamometers all use this form to control the drainage butterfly valve.

YP880, YP1200, YP1900 dynamometers are equipped with YZ60A drainage actuator produced by our factory, YP2500, YP3300, YP5900 dynamometers are equipped with YZ20 drainage actuator.


7、Lubrication parts
Lubrication parts are mainly used for rolling bearing lubrication of dynamometer.
YP60, YP120, YP250, YP380, YP520 and YP660 hydraulic dynamometers are all lubricated with grease, and their locations are shown in Fig. 2 (a). ZL45-2 lithium-based grease can be directly injected into the pressure oiler (tanker). The specific requirements are shown in Schedule 4.
The lubrication components of YP880, YP1200, YP1900, YP2500, YP3300 and YP5900 hydraulic dynamometers are shown in Figure 2 (b). Oil mist lubrication, drip oil lubrication and pump oil lubrication can be used respectively according to user's requirements and different working conditions.

(1)Oil mist lubrication

Oil mist lubrication can be used when dynamometer works at medium and high speed. Oil mist lubrication is mainly composed of gas source, pressure reducing valve, oil mist, gas pipe and so on. V-01/10 compressor can be used as gas source for a single dynamometer. Before starting the dynamometer, it is necessary to ensure the normal operation of the oil mist system. Oil mist lubrication is detailed in the instructions for the use of oil mist lubrication devices.

(2)Drip lubrication When the dynamometer works at a low speed, it can adopt drip oil lubrication instead of oil mist lubrication or pump oil lubrication.

If the working speed of YP1900 hydraulic dynamometer is below 2200 r/min, and YP3300 hydraulic dynamometer is below 1800 r/min, oil drop lubrication can be used.

(3)Pump oil lubrication

When the dynamometer works at a high speed, in order not to make the bearing temperature rise too high, the pump oil lubrication can be used.

Pump oil lubrication is mainly composed of pumping station and inlet and outlet oil system. Pump oil lubrication must start the pump station to lubricate the bearing of dynamometer before starting the dynamometer main engine and adding water for testing. Pump

oil inlet pressure can be adjusted by LI-10 throttle valve, and the pressure can be controlled in the range of 0.01-0.05 Mpa. It is suggested that as long as the working conditions are satisfied, the pressure should be as low as possible to reduce leakage.

四、Working Principle and Power Calculation of Dynamometer

1、 Working principle

The power machine drives the rotor components on the dynamometer spindle to rotate synchronously through the coupling, which stirs the water in the working chamber. Because of the centrifugal force produced by rotor rotation and the effect of rotor pits, water produces strong water eddy current between the side shell and the rotor pit. It gives the shell a rotating moment, so that the torque of the power machine is transmitted from the rotor to the shell. The brake arm mounted on the shell will rotate at an angle, so that the brake force is transmitted to the tension pressure sensor connected with the brake arm through the electronic digital display device. Display the braking force.

The dynamometer controls the opening of butterfly valve by electric drainage valve or drainage actuator by automatic regulating device. The opening of butterfly valve is controlled by drainage actuator to change the pressure of water in the working chamber of dynamometer to change the absorption power. At the same time, the speed of dynamometer can be measured by the speed sensor and displayed on the electronic display instrument.

Because it is a pressure-controlled hydraulic dynamometer and adjusts the pressure of working chamber by changing the opening of butterfly valve, the whole process must be an automatic closed-loop control system, so the pressure YP dynamometer must be equipped with an electronic control cabinet with automatic control function to operate.

2、 Calculation
(1)Power calculation
The effective power of dynamometer can be calculated by the following simple formulas when the length of statically calibrated arm is 973.8mm, guaranteed by the structure design.:
P= F n/ 10000 (Kilowatt)
Type: F--- loading (Newton)
N - Speed (Rotation/Point)
(2)Torque calculation
M=F.L (N.M)
Type:F---load(Newton)

L---Calculated arm length is 0.9549(m)

五、Water supply system of dynamometer
The water supply of dynamometer can be used in circulating water supply system. The water supply is provided by high pressure stabilizing water tank or low pressure stabilizing water tank plus pipeline pump. Generally, the indoor water tank in the north is composed of a low-level stabilized water tank and a pipeline pump (see figure 8).
The intake pressure of dynamometer can be greater than or equal to 0.05 MPa, usually 0.05-0.15 MPa. When the dynamometer works on the full water line, it requires higher water supply pressure; when it works below the full water line, the water pressure can be lower. The water supply pressure should be kept stable, and the range of pressure fluctuation should be (+5KPa). When the dynamometer works, the water supply pressure directly affects the cavitation degree of the side shell of the dynamometer and the concave working chamber of the rotor.
In the process of dynamometer operation, water intake can not be interrupted. The water intake is about 20 liters per kilowatt hour, the drainage temperature can not exceed 70 ~C, and the general economic drainage temperature is between 55 ~60 ~C.

The circulating water supply system is mainly composed of heat sink, water pump, stabilized water tank, intake and drainage connection pipeline, water pressure meter, valve and so on. The volume of the pool should consider heat dissipation and measure the maximum power consumption, and there is a certain amount of surplus to compensate for water dissipation in the process of circulation. It is suggested that the volume of the pool should be increased as much as possible when conditions permit. The volume of water tank should be considered when the maximum water consumption is constant water supply (see the table of technical parameters for water consumption). When the water supply of the pump is larger than the maximum power consumption of the dynamometer, the volume of the stabilized tank can be recommended to be about 2-5 M3. The smaller the water consumption is, the larger the water consumption is. The volume of the tank is generally about five times that of the tank. If conditions permit, try to be as large as possible.

The diameters of intake and drainage pipes should meet the requirements of the diameters of intake and drainage of dynamometers.

A gate valve and a water pressure gauge shall be connected in series in the intake pipeline. The gate valve is used to regulate the intake pressure. For a fixed engine type, it usually stops moving after one adjustment. Therefore, the gate valve can be installed in any convenient position, while the ball valve on the dynamometer intake pipe is used for opening and closing water supply.

Drainage pipes are generally larger than intake pipes. Drainage pipes can be circulated through clay pipes to the pool. If the user's water source is rich, it can also be discharged into the sewer. Two problems should be paid attention to in drainage pipeline: one is that the drainage can not be connected with the overflow pipe to prevent the overflow pipe from backfilling with excessive drainage pressure; the other is that if the drainage pipeline is not smooth, it will cause excessive backpressure, which will affect the normal test of dynamometer. Therefore, the pipeline arrangement should be as short as possible and with fewer elbows.

The circulating water will be used as dynamometer water after descaling, which will reduce the formation of scale in dynamometer. If there is no water treatment equipment, tap water or clean river water is allowed, but no sediment and other impurities are allowed to mix in. It is not suitable to use sea water. Depending on whether the PH value of water in different areas is high or not, it is necessary to install scale remover.

Figure nine Schematic diagram of water supply system

六、 Installation of dynamometers
1、 Bench Foundation
The test bench foundation is used to install dynamometers and engines. The quality of foundation design will have a great impact on the quality of test. In the design of bench foundation, the following aspects should be considered.
(1) The test-bed should be close to the side of the water source, and the distance between the foundation and the wall should be no less than 1.5 meters. Attention should be paid to the position of the calibration arm when the dynamometer is away from the wall. The whole laboratory requires good ventilation, sufficient light and lighting equipment to meet the requirements.
(2) The base of the bench should have enough mass to minimize the vibration of the bench. The foundation shall be poured with concrete of No. 90 and the proportioning shall be 1 portion of cement: 2.5 portions of yellow sand and 4 portions of stone by volume. Foundation pouring should take into account the measured object, so that the installed dynamometer can test various types of power engines. The position of foundation bolt can be constructed according to figure 10. (Fig. 10 is the foundation map of the installation of hydraulic dynamometer)
(3)Effective vibration isolation measures should be taken to reduce the transmission of vibration energy from the test bed to the outside world. The simple way is to lay a layer of yellow sand under the concrete foundation, and open a 200 mm wide and 800 mm deep anti-seismic groove around the foundation, fill it with sawdust or slag, and cover it with asphalt.
(4)Underground buried pipeline should be carried out before concrete pouring. If the exhaust pipe of power machine is installed underground, it should be more than 0.5 meters away from the pipeline.
2、Installation of dynamometer
Before tightening the anchor bolts, the dynamometer should be calibrated in two vertical directions with the installation accuracy of 1/1000 to ensure the sensitivity and correctness of dynamometer test.
3、Installation of Power Machine
Power machine should be installed according to the requirements of power machine. For some benches with changeable power model, it is better to install the power machine on the accessory bracket with three degrees of freedom (which is supplied by our factory), so as to make the installation and adjustment more convenient. When installing the throttle actuator in the engine, it is necessary to ensure that the stroke of the engine speed control handle is within the stroke of the throttle actuator.
4、Join
Universal coupling or elastic coupling should be used to connect dynamometer with power motor. When using rigid coupling, special attention should be paid to the coaxiality of two-axis installation. Generally, the coaxiality should be within 0.05 mm.
No matter which connection mode, the additional moment and axial force acting on dynamometer should be reduced as far as possible, so as not to cause fever, equipment and life accidents, so that normal testing can not be carried out. It is suggested that an auxiliary support should be installed near the end of dynamometer, which is a better method.
No matter which connection mode, the additional moment and axial force acting on dynamometer should be reduced as far as possible, so as not to cause fever, equipment and life accidents, so that normal testing can not be carried out. It is suggested that an auxiliary support should be installed near the end of dynamometer, which is a better method.


Fig. 10 Foundation Map for Installation of Hydraulic Dynamometer


The dimensions, intake and drainage diameters and locations of the installation foundation are shown in the table.

List of Foundation Dimensions for Installation of YP Hydraulic Dynamometer and Location of Overflow and Drainage Port of Dynamometer Base

Model
A
B
C
D
E
F
G
H
J
K
N
S
Z×L
M
W
g
YP60
1500
1400
500
25
750
900
640
390
340
590
25
90
4-M16×520
335
YP120
1600
1500
500
30
750
900
640
394
335
600
22.5
110
4-M16×540
350
YP250、YP380
1600
1500
500
30
750
900
640
400
330
580
28
100
4-M16×540
340
YP520 YP660
1750
1600
600
30
850
1050
760
490
420
700
35
120
4-M20×570
400
YP880
2000
1800
1200
35
1160
1400
1060
820
650
990
85
310
4-M22×800
/
384
351
YP1200
YP1900
2450
2180
1300
63
1600
1876
1476
1200
1074
1350
63
260
4-M30*1000
/
0
YP2500
YP3300
2560
2250
1500
69
1656
1959
1559
1256
690
1116
1421
70
260
4-M30*1200
/
0
nothing

List of Intake and Drainage Diameters and Locations of YP Hydraulic Dynamometer

Model Inlet caliber Drainage caliber X Y Q
YP60 G1″ G1 1/4″ 143 143
YP120 G1 1/4″ G1 1/4″ 165 165
YP250、YP380 G1 1/4″ G1 1/4″ 162 162
YP520、YP660 Φ50 ZG2″ 221 221
YP880 ZG2″ Φ54 0 354
YP1200、YP1900 ZG3″ Φ85 151 581
YP2500、YP3300 ZG5″ Φ130 203 669

The table is not marked in millimetres.

七、Calibration of Dynamometer
Static arm is generally designed as 973.8mm. Put 1 kilogram of weights on the weighting tray and display 10 Newtons correspondingly; 2 kilograms show 20 Newtons....
For structural reasons, if the arm length is enlarged or reduced to a certain magnification, the display value should also be enlarged or reduced to the same magnification.
The specific operation is as follows:
1. Install static calibration tools: calibration arm and hanging basket; 2、For digital calibration of instrument, please read EMC900 instruction for calibration operation. 3、Remove the calibration tool at the end of calibration. 4、EMC900 controller must be restarted until the end of 100 seconds countdown.
八、Use of dynamometer
1、Before boot

(1) Loosen the bolt of the sensor protection device to make the stator free.

(2) Check the connection between coupling and spindle.

(3) Check the coaxiality of the power machine and dynamometer.

(4) Check the connection and circulation of the inlet and outlet pipe systems.

(5) Clean the appearance, add lubricating oil to each lubrication point, and rotate the spindle to check whether the rotor and other components have collision and rotation inflexibility.

(6) The calibration meets the requirements.

(7) Fully open drainage butterfly valve (minimum load position).

2. Start-up test

(1) Start the power machine to drive the dynamometer spindle to rotate at the same speed. After the power machine is running normally, the test can be carried out.

(2) Fully open the intake valve and adjust the opening of the drainage butterfly valve until it is consistent with the working condition of the power engine.

(3) Four control modes, namely, constant position, constant torque, square torque and constant speed, can be selected to control the electronic control cabinet matched with dynamometer in the test of engine external characteristics, speed regulation characteristics, load characteristics and other characteristics.

(4) For some engines, sometimes the water supply pressure of a fixed dynamometer can not meet the test requirements of all working conditions, which can adjust the water supply pressure properly under different test conditions.

3. End of the experiment

(1) Close the intake valve.

(2) Fully open drainage valve.

(3) The engine runs at low speed for several minutes and then stops.

(4) Rotary sensor protection device, so that the stator is locked, the sensor is not forced.

(5) Cut off the power supply connected with the electronic control cabinet.

(6) Stop lubricating system oil supply.

(7) If the test is not done for a long time, the bottom drain valve of dynamometer should be opened to remove the accumulated water. If conditions permit, the upper end of the shell screw (except YP1900) can be unscrewed and the accumulated water can be purged with compressed air. The position of the screw is shown in Fig. 3 (a), (b).

In order to prevent bearing from entering water, please remember!!! The principle of "first start, then drain; first shut down, then shut down". To ensure that the dynamometer in the rotating state of water, but also should prevent the dynamometer in the anhydrous state of continuous operation for too long and burnt the sealing parts. (Require anhydrous working time is not more than 2 minutes.)

【Refresh】【Favorites】【Print】 【Close】
Previous:Two box temperature shock test chamber Next:YPS type unidirectional hydraulic dynamometer
婷婷五月天社区| 欧美日本日韩| 婷婷丁香六月五月天| 综合AV在线| 久久激情视频99| 任你草| 亚洲小视频免费观看| 五月丁香天堂网| 开心五月激情| 大香蕉视频婷婷| 99热免费看| 加勒比久热| 欧美乱大交XXXXX潮喷l头像| 思思99热热热99| 欧美性猛交99久久久久99按摩| 99这里精品| 国产成人精品一区二区三区视频| 在热视频精品| 久久激情天堂| 国产看真人毛片爱做A片| 99热日韩这里只有精品| 91人妻九色大屁股| 玖玖婷婷五月天| 激情黄色小说色五月| 九九碰九九爱97超碰| 国产裸舞福利资源在线视频| 人人操大| 亚洲乱码日产精品BD| 成人AV在线网站| 99热国产| 五月天欧美激情| 婷婷丁香五月天色色| AA丁香综合激情| 香蕉久久国产AV一区二区| 色五月激情五月天| 99爱最新免费视频在线观看| 日韩xx在线| 大香蕉婷婷丁香视频在线| 色99视| 五月婷婷综合在线视频| 99在线资源| 亚洲色9| 欧美黄色一级录像| 九月av| 五月永久激情| 五月丁香激情综合六月涩涩爱| 婷婷丁香五月综合| 久99热| av国产精品偷| 亚洲精品V天堂中文字幕| 综合激情五月天六月婷免费视频| 99ri国产在线| 99免费超碰在线| 99热这里只有精| 丁香色五月婷婷17C| 91呦呦呦| 91婷婷在线| 色婷婷五月天小说网| 色婷九九九| 亚洲人妻av| 五月丁香欧美综合免费视频| 婷婷五月综合久久中文字幕| 婷婷在线视频| 成人国产综合| 久久久久久人妻久久久久久久久久人妻久久久| a色色色色色| 婷婷综合性爱网| 日本欧美成人片AAAA | 婷婷五月天视| 色婷亚洲五月丁香| 色色丁香| 婷婷中文字幕| 五月婷婷在线视频观看| 天天综合色综合| 狠狠色噜噜狠狠狠狠综合| 久久综合99| 97色女人在线| 色色网五月激情| 激情综合啪啪啪| 亚洲av无码影院| 久久99网| 综合激情在线视频| 欧美成人精品一区二区| 五月天开心色情网| 色婷婷九月| 国产91在线视频| 国产毛片精品一区二区色欲黄A片| 夜丁香五月婷婷| 天天做天天爱天天爽夜夜揉| 九九人人自拍| 99热最新国内| 色五月激情五月| 欧洲色色| 99精品福利视频| 综合在线丁香五月| 亚洲色综合| 99无码视频| 另类图片 五月激情| 九九热123| 五月天婷婷爱| 9久久久久| 国产69精品久久久久999小说| 91呦呦呦| 97碰碰视频在线观看| 99在线精品视频观看免费下载| 五月婷婷网久久| 99精品视频免费观看| 91色综合| 久久婷婷桃花五月天| 99在线视频精品| 5月色亭亭视频| 久久九九视频| 97干在线视频| 色婷婷性爱网| 狠狠爱婷婷| www.日本91| 婷婷五月花免费视频在线| 另类国产综合| 乱亲女洗澡69XX| 日韩啊啊啊| 波多婷婷久久| 中文字幕永久免费| 色青五月天| 色婷婷先锋| 国产在线aaa片一区二区99| 天堂美国久久| 九九AV| 79成人网| 激情六月婷婷| 成人 在线观看国产| 欧美啪啪五月天| 色婷婷五月天激情| 播五月,色五月,开心五月播放器| 丁香五月在线观看| 一本狠婷婷综合| 中文字幕永久免费| 思思热在线播放| 婷婷色在线观看| 九九综合九| 97碰久久| A网在线欧洲| 中文色婷婷| 五月婷婷久草| 五月天色色色| 黄色激情五月天| 性一交一乱一交A片久久四色| 久久国产成人9999久久久久| 中美日韩成人在线| 99成人免费视频| 色热久| 国产探花一片区| 九九热这里有精品视频| 亚洲色爱综合| 国产肥白大熟妇BBBB视频| WWW·色色色·COM| 色99综合视频| 91久操| www.玖玖婷婷在线| 五月丁香六月婷婷综合免| 99色色视频| 国产肥白大熟妇BBBB视频| 九九综合网色全集| 操逼在线视频| 九九色热| 五月激情射| α久久| 91狠狠色| 97人人看一| 《》【无码】想被搞到爽AV应募而来的超M素人 西纯子 10musume-011723-01 | 六月伊人| 欧美97超碰| 丁香五月精品视频| www.五月天婷婷| 碰超亚洲| 亚洲色五月天在线| 色5月婷婷色| 人妻有码乱操| 婷婷深爱色五月| 99re在线视频| 操操熟女| www色中色综合| 色情综合网| 六月婷欧美| 日日色综合| 丁香九月婷婷| 热久久77777| 九九综合色综合| 色约约视频一区二区三区四区五区 | 五月天色综合| 香蕉人在线香蕉人在线 | 大操人妻| 颜射 精品性爱av| 操人91| 婷婷久久免费| 色欲资源网| 一本色综合色| 激情深爱综合| 色婷婷久久综合| 日韩欧美一道四区中文字幕| 丁香五月av| YW无码| 激情二色月| 亚洲熟妇无码乱子AV电影| 黄网在线免费观看| 91热视频色网站| 色月丁| 久机视频这只有精品| 亚洲丁香花五月丁香花| 午夜精品777| 久久婷婷五月综合| 婷婷香香五月| 成人在线精品| 婷婷的久久网站| 丁香花免费观看完整视频| 人操91在线| 天堂AV在线看| 亚洲AV成人一区二区在线观看| 色婷丁香五月| 天天爽天天干| 日韩欧美一区二区三区四区| 久久综合五月天| 天天爽人人综合免费7799| 激情又色又爽又黄的A片| 久热re在线视频| 婷婷五月花丁香| 久久久婷婷| 99色一| av大片在线| 色999;丁香五月| 九九九九操逼| 五月婷婷婷婷婷婷艺术| av免费在线看不卡无毒| 99久久综合精品五月天| 狠狠干最新地址| 人人干Av| 亚洲无码性爱| 色停停五月,在线观看| www.爱婷婷.com| 99re这里| 色一情一乱一乱一区9| 五月婷婷丁香俺日污视频| 久久九九99.www| 噜噜色婷婷| 激情AV中文| 天天爽夜夜操| 五月色色色| 2019中文字幕视频| AV激情五月| 疯狂做受XXXX高潮A片动画| 日日日日做夜夜夜夜无码| EEUSS鲁片一区二区三区| 天天综合.com| 北条麻妃伊人| 综合噜噜| 99久.| 五月天激情四射| 激情五月综合视频| 啪啪日热| 777影视理论片大全在线观看| 激情四射网| 五月天色色婷婷| 九九综合精品| 色五月综合网| 99av视频| 色婷婷888| 荫道BBWBBB高潮潮喷| 色视五月天婷婷| 精品热九九| 五月天婷婷无码| 天天操中文字幕| 五月大香蕉| 国产精品在线视频| 丁香五月婷婷老师网站| 免费无码又爽又刺激A片涩涩直播| 久Se视频在线观看| 亚洲国产精品VA在线看黑人| 99久久99热这里只有精品| 婷婷五月天丁香久久| 五月天激情电影| 狠狠色丁香| 国产亚洲在线| 天天色天天爱天天爱天天爱y| 百度4399有码精品V在线观看| 丁香蜜臀黄色婷婷五月天| 婷婷在线观看五月天在线视频| 白人荫道BBWBBB大荫道| 婷婷 月 丁香| 久9热在线视频| 另类图片五月天| 欧美激情综合色综合| 日本操片| 搡BBBB搡BBB搡18| 五月天婷婷丁香六月| 操九色| 婷婷天天色| 丁香五月综合在线观看| 狠狠色婷婷7777久| 岛国AAAV| 啪啪啪大香蕉| 婷婷五月天电影区小说区| 人妻综合网| www.99热| 日本在线99| 综合激情五月四射婷婷| 美女视频图片久久91| 婷婷97碰碰| 丁香五月激情综合网激情五月| 国产精品岛国片在线观看免费| 五月丁香综合啪啪| 视色综合| 日韩九九视频| 影院久久久| 在线另类| 天天干天干| 亚洲国产婷婷色五月| 亚洲超碰青涩| 欧美精品999| 天天爽天天透天天爱| 亚洲综合在线播放| 九月婷婷在线视频| 99热在线精品观看| 天天日天天干天天操| 五月在线婷色| 欧美色色色色色色色色色色| 青柠影视免费高清电视剧| jiZZdr| 五月天六月天| 色六月婷婷| 色九四色| 久久丁香五月天| 人妻无码精品一区| 99高级会所久久| 玖玖激情五月天| 在线中文AV| 久久久99久久| 亚洲狠狠干| 狠狠色丁香综合| 99人妻碰碰碰久久久久视| 久久精品99国产精品日本| 成人中文网| 久久久99精品| 大香蕉久久伊人婷婷五月丁香| 开心久久网婷婷| 99网| 激情婷婷五月| 丁香花电影高清在线小说阅读| 操嫩逼电影| 亚洲激情网| 丁香五月婷婷99| 91啪啪| 人人爱人人草| 成人电影在线免费试看| 五月亭亭六月天| 激情五月网站| se99高清无码| 超碰色色综合| 9999热在线观看| 超碰在线50| 色三级色三级| 亚洲乱码日产精品BD| 婷婷五月伦理| 婷婷激情综合色五月久久,色婷婷丁香花,丁香婷婷五月情天,久久婷婷五月综合色 | 五月丁香婷婷色色| 香蕉人在线香蕉人在线 | 久久人妻在线| 亚洲成人电影aaaa| 美女天天久久| 婷婷五月激情网| 久婷婷五月天影院| 久久激情婷婷| 爱iii做iiii日| 婷婷色色五月天| 狠狠做婷婷| 日本啪啪网| 色婷婷小说网| 丁香成人视频| 五月天婷婷青青草| 91dy.av| 无码地址| 婷婷丁香社区网| 亚洲中文av| 色综合香蕉| 俺去婷婷 丁香| 91色性感五月婷婷丁香| 亚洲操操| 少妇做爰免费视看片| 久操人妻| 综合久久97| 玖玖婷婷色五月| 久久hd| 色婷婷亚洲婷婷在线观看| 性天天中文网| 久久婷婷五月综合色丁香| 婷婷五月婷婷五月天| 九九成人高清视频| 在线区区区| 天天摸.天天mo| 伊人婷婷大香蕉| 综合激情在线| 国产综合视频婷婷| 99热新网址| 在线资源av-超碰中文在线-成人AV | 婷婷激情啪啪| 99碰| 伊久久婷婷| 日本一级特黄大片AAAAA级| 婷婷国产欧美97| 九九超日本| 色色色色色综合| 婷婷第一页| 99免费偷拍视频| 综合久久综合五月天婷婷| 婷婷日本色| 久久国产AV| 大香蕉人人网| 六月丁香狠狠爱| 99爱爱网| 国产精品色婷婷99久久精品| 五月丁香激| 久久婷婷网站| 97操操| 激情六| wwW天天干| 综合99在线| 婷婷综合成人五月天| 草美女在线观看视频在线播放| 亚洲99激情| 五月社区婷婷激情| 五月综合缴情网| 五月好婷婷| 思思精品视频| 大地资源色婷婷视频在线| 26.uuu丁香五月婷婷| 久久色五月| 午夜丁香| 亚洲亚洲人成综合网络| www.wuyuetian啪啪| 免费在线观看av网站| 婷婷五月丁香综合桃花色网| 亚洲成人另类| 天天日天天舔天天摸| 五月丁香直播| 99热只有精| 色五月av| 婷婷久久综合久| 丰满少妇猛烈A片免费看观看| 久久综合九色综合97婷婷| 91聚色综合网| 哇嘎成人久久| 天天狠天天狠| 台湾佬天天日丁香婷婷五月天| 人人爱人人摸人人澡| 激情五月婷婷| 亚洲综合激情五月久久| 91久久久久久久久久18| 伊人成综合五月婷婷| 丁香五月婷婷亚洲激情四射| www.久久99| 天天干天天日日| 五月激情久久| 99人妻碰碰碰久久久久禁片| 日本99视频| 天天透天天干| 99操逼| 亚洲99在线视频| 婷婷五月丁香综合激情| 乱码操操| 亚洲欧美综合7777色亭亭| 97超级碰碰碰| 26uuu美女三级视频| 五月天色视频| 成全看免费观看完整版| 日本人妻伦在线中文字幕| 婷婷色综合网日韩国产| www.91操| 亚洲行行色色| 人妻互换HDF中文| 色五月 五月婷婷| 国产精品成av人在线视午夜片| 色玖玖导航| 亚洲第精品| 67194在线接播放| 99热| 日韩视频女神99| 六月丁香婷婷拍拍| 色婷五月天激情| 91啪啪视频| 久热精彩视频98| 男女99免费视频| 欧美性丁香色色五月天| 偷拍91九色| 五月婷婷丁香六月| 人人干99| 狠狠插狠狠| 久久婷婷六月综合| 超碰在线个人观看| 五月综合激情久久| 开心五月网| 婷婷五月天成人网| 色五月天丁香婷婷色| Av大香蕉| 色婷婷狠狠18| 思思久久99热只有频精品66| 操操自拍| 丁香五月六月婷婷综合激情| 996热| 欧美成综合在线观看| 色婷婷五月天激情| 激情综合五月开心狠狠| 农村熟妇高潮精品A片| 99热碰碰热| 综合激情深爱| 天天色天天操天天射| 丁香六月婷婷社区| 99热骚货| 丁香五月电影| 婷婷丁香成人五月天| 久久久区区一久久久久久| 婷婷五月丁香综合| 国产婷婷久久| 另类小说婷婷色| 99久久99九九99九九九| 夫妻超碰在线| 99热只有精品在线观看| 深爱激情五月天| www久久艹| 天天干、天天日日| 国产成人精品一区二三区熟女在线| 天堂综合久| 成 人片 黄 色 大 片| 综合久久五月天| 日韩国产AV播放| 色播五月婷婷综合| 色婷婷激情| 影院久久久| 偷拍视频五月天| 亚洲av骚货| 五月婷婷深深爱| 在热视频精品| 亚洲无AV在线中文字幕| 色综合婷婷| 99热这里只有精品9| 婷婷丁香精品视频在线观看| 色婷婷成人在线| 久草大| 99热欧美偷拍| 狠狠草狠狠草| 香蕉久久五月| 婷婷激情五月综合丁香社| 色综合五月天| 婷婷五月激情综合| 性天堂久久| 婷婷丁香综合| 五月丁香婷婷激情视频| 免费无码毛片一区二区A片| 九九热这里只有精品23| 亚洲天堂大香蕉| 午夜日日| 九九热在线视频观看| 91麻豆国产三级精品福利在线观看| 性爱在线播放av| 狠狠色综合网| 丁香五月综合高清在线| 中美日韩成人在线| av在线中文| 九九热免费视频| 欧美婷婷九月| 五月婷婷六月丁香激情| 五月天丁香欧美激情| 俺也去在线视频 | WWW激情五月天| 被强行糟蹋的女人A片| 99久久免费性爱视频`| 综合久久97| 日本久久99| 日韩无码专区| 久99热| 97精品欧美91久久久久久久| 9久国产精品| 天天肏天天肏天天肏| 99免费青青蜜臀| 亚洲五月婷婷| 久久久jd| 久碰婷婷视频| 操久久网| 九九香蕉网| 啪啪啪大香蕉| 中文AV网站| 丁香六月婷婷综合色| 久久免片| 91艹人| 91久操| 热久久77777| 无码色| 青草热视频这里只有精品| seav天堂| 天天色激情| 久久99免费视频| 成年人丁香五月| 久久丝袜婷婷| 婷婷无码视频| 秋霞三级色戒| 99精品成人无码A片观看金桔| 亚洲欧洲自拍图片专区五月天| 无码人妻少妇色欲AV一区二区| 五月丁香综合伦理片| 五月婷婷视频| 色婷婷色五月天| 大香蕉75线| 狼人婷婷综合| 丁香婷婷激情综合五月激情| 成人国产欧美大片一区| 综合性视频99| 在线观看日韩12345区| 婷婷丁香五月综合网上 | 激情综合色| 五月天综合在线| www婷婷色情网| 婷婷五月丁香国产| 丁香五月人妻| 久操无码| 伊人综合网站| 婷婷五月天综合小说网| 综合五月丁香六月婷婷| 操操人人| 日日色五月天| 日本成人内射| 激情四射婷婷| 99色看这里只有精品| 操逼五月婷婷| 玖玖婷婷五月天| 99ri在线播放| 久机视频这只有精品| 丁香花五月天| 色五月婷婷影视| 另类综合激情| 激情都市五月天| 玖玖婷婷视频| 丁香九月激情| 婷婷综合网伊人| 色很久综合| 五月激情啪啪啪| 99福利视频| 人人插9| 天天操比比| 伊人色综在线| 大香蕉婷婷五月| AA丁香综合激情| 婷婷开心五月| 六月丁香啪啪| www.第四色99| 91婷婷色| α久久| 五月亭大香蕉| 高清无码入口| 丁香五月婷婷六月| 99综合视频一体| 五月J香蕉婷婷| 99热这里只有精品1| 久久综合激情五月天| 久久婷婷五月综合网| 亚洲婷婷91丁香| 久色中文| 丁香五月手机在线| 婷婷丁香色五月天| 99热99精品| 另类激情五月| 久久婷婷五月丁香网| 九九AV| 91狠狠综合网| www.lingjunshare.com| 九色视频91| 天天日日| 久久久激情| 日婷婷| 免费的日逼视频| AVV黄| 情欲禁地| 97干婷婷| 久热A| 婷婷五月天激情四射| 影音先锋男人av资源站| 97啪啪| 综合久久人妻| 欧美噜噜噜草| 9热在线观看| 超碰免费人| 五月婷婷啪啪网| 深爱激情69热| 欧美天天五月丁香免费观看| 久久久婷婷五月亚洲97号色| 国产FREESEXVIDEOS性中国| 天天干天天干天天干天天干天天干| 狠狠色五月激情| 99人人操| 伊人久久丁香狠狠婷婷综合香蕉| 久碰视频| 色五月情| 天天干天天爽天天操| 九九热这里有精品视频| 色婷婷91| 九九热内射| 色五月亚洲| 日韩精品一区二区三区色欲AV| 激情五月六月丁香| 五月色综合网欧美网| 久久综合婷婷五月| 日韩野外 无套| 婷婷五月激情中文字幕| 嗯灬啊灬把腿张开灬A片视频| Va另类视频| A√天堂网在线| 97碰| 久久区区一二三av| 黄网在线免费| 久久这里只有精品热在99| 99毛片| 色综合激情| 99视频在线观看视频| 婷婷五月成人| 五月丁香六月婷婷的女人| 99热10在线高清播放| 99视频只有精品| 久久久性爱视频| 亚洲色五月婷婷| 99久久综合网| 天天成人综合| 丁香六月婷婷综情欧美| 国产精品操| 九九re视频在线视频| 专区无日本视频高清8| 大香蕉AV在线| 在线网黄| 麻豆国产精品色欲AV亚洲三区 | 天天色噜| 开心五月深爱五月丁香五月激情五月 | 久久久久人妻| 开心激情播播五月天| 伊人五月网| 婷婷色五月偷拍| 亚洲1区| 玖玖在线视| WWW.久久久久久久久久久久久| 啪啪视频99| 久久全意婷婷| 久久99综合| 久久婷婷六月综合综合| 欧美性爱五月天| 超碰精品在线| 超碰成人在线观看| 丁香五月婷婷综合精品素人| 久久九九热视频| 日本va视频| 亚洲五月天综合| 99高级会所久久| 丁香五月激情天AV无码| 婷婷激情五月| 99视频这里只有免费精品| 九九热欧美| 97超碰人人操| 51成人| 六月色播| 六月激情婷婷| 亚洲中文字幕网| 五月婷色色| 97在线碰| 中文字幕在线免费观看视频| 五月丁香婷婷综合久久| 日韩在线视频网站| 色碰干| 色色激情五月| 五月天色色网站| 婷婷色五月丁香六月欧美啪| 激情黄色小说色五月| 亚洲在线资源| 9 1超碰九色| 99热最新地址在线| 婷婷六月丁香开心深深爱| 色八月婷婷| 亚洲第一色网站| 五六月丁香激情视频| 婷婷色五月色妇| 深爱激情网噜噜色| 激情网婷婷婷| 久久色情综合免费网站| 五月网| 色99热| 亚洲九九夜夜| 丁香婷婷六月| 亚洲网站观看视频| 99色人| 伊人大香久久| 日本久久99久久| 久9精品视频| 九九成人精品免费视频| 欧美激情五月天婷婷| 玖玖在线资源视频| 天天综合永久| 天天婷婷综合亚洲亚洲| 婷婷六月激情综合| 天天色天天日天天舔| 久久99久久99精品免观看粉嫩| 日本91在线| 天天日天天插| 丁香网五月天| 美女被肏网站在线看| 色色色色色综合| 婷婷九月亚洲| 思思热国产视频| 夜夜人妻五月天| 婷婷丁香五月,狠狠综合| 国产综合网在线| 久草热久草在线视频| 婷婷性爱网| 最近中文字幕2019视频1| 女同在线9| 色五月婷婷AV| 色五月婷婷婷婷婷婷婷婷婷婷| 99极品视频| 色色综合视频| 五月天综合在线| 亚洲精品电影| 天天草天天爽| 成人va在线| 亚洲综合草草| 久久久久亚洲A∨成人乱码电影| 综合视频五月| 老美AA片| 久久只有18视频| 五月天综合在线网| 欧美激情伊人| 99小精品| 九九精品网| 玖玖爱综合网| 97人人射| 另类视屏| 五月天婷婷午夜丁香| 五月丁香无码| 九九这里是免费的视频5| 国产亚洲精品久久久久久久久动漫| 超碰在线资源| 色婷婷狠狠18禁| 天天日,夜夜爽| 国产精品国产| 中字幕视频在线永久在线观看免费| 91九九九九九九| 欧洲亚洲免费视频9 | 婷婷综合九月| 久久五月视频| 亚洲一区二区无码蜜乳av| 99re在线播放| 免费看欧美成人A片无码| 69人人操人人爽| 99综合网| 五月丁六月香| 午夜大香蕉| 久久久久9久无码视频| 欧美三日本三级少妇三99| 天天插天天草人人玩| 久久六月综合| 五月婷婷色播| 五月丁香婷婷啪啪综合| 思思久ren热| 狠狠色狠狠操| 成AV人片一区二区三区久久| 97婷婷在线| 丁香伊人激情| 蜜桃人妻无码AV天堂三区| 国产精品久久久久久久久久| 99狠狠| 五月丁香六月婷婷综合网| 色婷五月天| 国产毛片精品一区二区色欲黄A片| 欧美日韩国产伦精品日韩人妻一| 婷婷舔| 婷婷五月天情色| 欧美成人AAA片一区国产精品| 欧美久久网| 久久在线人妻| 亚洲第一黄网| 激情五月天天| 久久五月天激情美女| 色综合激情| BBWCUCKOLD精品熟妇| 日韩天堂久久| 我爱婷婷五月天综合88| 国产9色在线/日韩| 丁香五月婷婷操逼| 婷婷六月爽| 青青草原伊人网| 97人人操人人插| 性爱先锋AV| 成人在线日韩欧美| www...com黄在线观看| 超碰狠狠操| 天天天干夜夜夜操| 热热色色五月天婷婷| 综合久久婷婷| 精品久久99码| 国产精品国产成人国产三级| 4399在线日本A片| 思思 热 99| 中文字幕有多少字| 97人人超| 看片视频在线免费日产在线看| 性爱久久| 九九热只有这里精品| 欧美性猛交99久久久99| 亚洲精品无码A片一区二区| 天天弄天天爽| 日本在线视频播放91| 岛国操B不卡在线| 99热这里只有精品2024| 五月丁香婷婷欧美| 丁香婷婷五月综合色情| 五月六月伦理| 五月婷视频| 月婷婷亚洲| 丁香久久| 99热亚洲| 日本成人噜噜噜| 免费观看高清无码| 玖玖资源网站最新站| 九九色热| 日本婷久久| 丁香五月欧美午夜视频| 五月婷狠狠| 九九热区一区二区三区| 99热婷婷| 影音先锋毛片网站| 狠狠狠色激情综合适合| 久久久亚洲成人无码A片| 六月丁香婷婷尤物| 99久久国产宗和精品1上映| 大香蕉五月天婷婷| 色综合久久88色综合天天99| 久久亭亭电影| 婷婷丁香综合成人| 久久性爱99国产| 99色热视频| 亚洲中文字幕在线观看| 99热 这里只有精品 国产 日韩| 久99热在线观看| 99精品视频推荐| 五月天另类小说| OYIWbGcPu8H| 色五月婷婷内射| 色五月 婷婷, 大香蕉| 丁香六月视频| 香蕉综合网| 婷婷六月丁香久| 色五月婷婷在线| 久久久www| 第四色激情网| 久热人妻| 久婷婷婷| 九九99在线免费在线观看视频| 婷婷久久五月天丁香| 综合激情五月婷婷| 97热精品| 久婷婷婷| 任你日视频| 色丁香久久| 婷婷五月丁香六月| 婷婷五月天久久| 天堂中文在线资源| 久久久久亚洲AV成人无码电影| 人人操人人干AV| 婷婷少妇激情| 日本超碰在线| 五月天婷婷色在线视频免费观看| 色播六月| 激情五月深爱五月| 99在线免费观看| 精品国产va久| 超碰人人摸人人操| 久久在线人妻| 青青久久五月天丁香婷婷| 五月婷婷综合色啪首页| 久久受www免费人成| 五月草影视| 变天就操逼婷婷五月| 国产欧美va| 97欧美在线| 区美毛片子| 久久综合丁香五月| 99热成人| 婷婷丁香人妻| 婷婷黄色网| 色婷婷丁香五月天在线观看| 亚洲成片在线观看| www.久热| 91丨九色丨丰满人妖| 久久9视频欧美| 天天射影| 免费看欧美成人A片无码| 色五月婷婷狠狠撸| 搡BBBB搡BBB搡18| 婷婷五月天资源| 五月婷天堂视频| 97色色网| 久久久人妻不卡| 亚洲情综合五月天| 婷婷五月天,影院| 婷婷丁香精品视频在线观看| 噜噜视频| 大香蕉九操| 搡BBBB搡BBB搡五十| 天天狠狠色噜噜| 婷久久久| 97五月久久丁香婷婷| 97在线视频观看| 99无码精品| 激情婷婷五月天日本系列| 日韩黄色AV无码| 欧美成人精品A片免费一区99| 精品乱码视频| 亚洲乱码日产精品BD| 色情免费视频播放| 色天堂97| 任你草| 亚洲视频色色| 丁香五月很很肏| 婷婷内射视频在线| 99久久婷婷国产综合精品青桔| www.99视频| 国产午夜精品久久久观看| 五月婷婷六月丁香玖玖玫瑰91| 丁香五月综合婷婷| 国产成人VA| 婷婷久久欧美| 在线天堂9| 久久久久久久久久久久久久人妻视频| 操B无码视频国语| 最近2018中文字幕免费看2019 | 久久与婷婷| 97干资源在线观看| 成人丁香五月| 天天摸,天天爽| 俺去婷婷 丁香| 任你草| 五月六月丁香婷婷在线观看| 久久婷鲁| 另类视频在线| 婷婷五月天色综合| 天天搞天天色综合| 精品久热| 五月丁香婷婷免费视频| 高清无码.com| 91久久国产自产拍夜夜91久久精品文字>91麻豆精品国产 | 国产AV一区二区三区日韩| 丁香六月婷婷综合在线| 99热免费精品| 国产毛片精品一区二区色欲黄A片| 五月婷婷在线播放| 婷婷激情综合| 亚洲妇女熟BBW| 99热6精品| 99色在线观看免费| 婷婷五月天丁香综合网| 天天综合网91| 热久久视频99| 91疯狂操操操操| 人妻丰满精品一区二区A片| 精品成人a v无码内射| 激情五月激情综合俺也去婷婷小说| 97色五月丁香婷婷| 91热在线| 99色亚洲| VA五月激情在线| 去色色五月天| 久久精品国产一区二区三区四区| 久久婷婷六月综合综合色| 中文无码婷婷| 色婷婷无吗| 五月丁香六月婷婷网| 五月天色婷婷激情| 久久婷婷激情五月天一区二区| #NAME?| 色婷婷国产精品综合在线观看| 欧美综合丁香网| 91网站黄| 大香蕉av在线| 婷婷五月综合社区| 丁香五月激情鲁| 人妻性爱| 99碰| 色图亚洲91| 五月丁香六月激情在线| 日日天天干| 成人五月天在线视频在线观看| 九九精品热播| 日韩AV免费电影在线播放| 超碰三级片| 天天干天天爽天天操| 97自拍视频在线| 久草嫩草在线观看| 国产人妻777人伦精品HD| 精品女人九九九| 天天天天天天噜| 狠狠色婷婷7| 97干欧美| 五月婷中文娱乐综合| 99综合视频| 女主播扒开屁股给粉丝看尿口| 色婷婷丁香五月天激情综合网| 久久最新色色色| 97黑人精品区| 中国女人内射6XXXXX| 97香蕉碰碰人妻国产欧美| 婷婷五月天在线一区| 五月丁香六月婷婷综合伊人| 国产激情综合五月久久| 激情网 久久| 日韩啊啊啊| 另类 在线| 色欧洲| 综合久久五月| 五月色婷婷综合色| 久操人妻| 激情 婷婷| 色天使久久综合| 亚洲视频在线观看| 久9免费视频| 婷婷五月天在线综合| 五月天久久婷婷婷| 丁香丁香激情网| 精品成人在线观看| 色色999三级片| 日韩限制级大尺度黑料泄密大尺度视频一区二区在线观看 | 五月天堂色| 99热精品观看| 色九九中文字幕| 五月开心播播网| 嫩草AV久久伊人妇女超级A| 啪啪综合| 五月天开心网| 天天综合亚洲| 六月婷婷色五月| 亚洲五月婷婷在线| 99视频精品全部免费看| 久久婷婷综合网| 亚洲色色五月天| 欧美WW在线网| 五月色丁香婷婷综合| 99热国品| 51精品国自产在线| 99婷婷| 色五月在线观看| 97色婷婷成人综合在线观看| 8区视频在线| 丁香 亚洲 久久| 五月天婷婷爱| 成人免费va| 深爱激情网综合| 特级片神马电影| 婷婷夜夜夜夜| 99久久er| 五月婷婷精品视频| 六月丁香射婷婷欧美色图片 |